Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways

Normal ropeway operations resumed at Gangtok on the 11th of December for half of the day and became fully operational from the 16th of December, Damodar Ropeway said in its release today. It was shut down for 16 days for scheduled annual maintenance from the 25th of November to the 15th of December, 2022, with a few trial runs. Gangtok...

NewsVoir
NewsVoir Verified Media or Organization • 25 Apr, 2026Agency
Jan 5, 2023 • 2:04 PM  0
P
Press Release
NEWS CARD
Logo
Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways
“Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways”
Favicon
Read more onthebizzstories.com
5 Jan 2023
https://www.thebizzstories.com/ropeway-operations-resume-at-gangtok-was-shut-for-scheduled-annual-maintenance-damodar-ropeways
Copied
Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways

Normal ropeway operations resumed at Gangtok on the 11th of December for half of the day and became fully operational from the 16th of December, Damodar Ropeway said in its release today. It was shut down for 16 days for scheduled annual maintenance from the 25th of November to the 15th of December, 2022, with a few trial runs.

Gangtok Ropeways

historyThis is an archived post. The information provided may be outdated.
NewsVoir

NewsVoir Verified Media or Organization • 25 Apr, 2026Agency

(This is an unedited and auto-generated story from Syndicated News feed, TBS Staff may not have modified or edited the content body)

homeHomeamp_storiesWeb Storieslocal_fire_departmentTrendingplay_circleVideosmark_email_unreadNewsletter