New Gujarat Plant fully commissioned with receipt of dedicated power supply

Ahmedabad (Gujarat) [India], January 23: Kaka Industries Limited, a leading manufacturer and supplier of PVC-based products, proudly announces the full commissioning of its advanced manufacturing facility in Village Lasundra, Tehsil Kathlal, District Kheda, Gujarat. This milestone comes after successfully resolving a persistent power supply issue that had limited the plant’s operational capacity for the past [...]

Dinesh Kumar
Dinesh Kumar Verified Public Figure • 25 Apr, 2026Author
Jan 23, 2025 • 1:03 PM  0
B
Business
NEWS CARD
Logo
New Gujarat Plant fully commissioned with receipt of dedicated power supply
“New Gujarat Plant fully commissioned with receipt of dedicated power supply”
Favicon
Read more onthebizzstories.com
23 Jan 2025
https://www.thebizzstories.com/new-gujarat-plant-fully-commissioned-with-receipt-of-dedicated-power-supply
Copied
New Gujarat Plant fully commissioned with receipt of dedicated power supply
New Gujarat Plant fully commissioned with receipt of dedicated power supply

Ahmedabad (Gujarat) [India], January 23: Kaka Industries Limited, a leading manufacturer and supplier of PVC-based products, proudly announces the full commissioning of its advanced manufacturing facility in Village Lasundra, Tehsil Kathlal, District Kheda, Gujarat. This milestone comes after successfully resolving a persistent power supply issue that had limited the plant’s operational capacity for the past six months.

The facility spans an impressive total land area of approximately 8,00,000 square feet, with 4,00,000 remarkable capacity utilization of 40,000 metric tons per annum (MTPA), the plant’s output will exceed the current capacity utilization of 18,000 MTPA by more than 120% over the next 2 to 3 years.

Dinesh Kumar

Dinesh Kumar Verified Public Figure • 25 Apr, 2026Author

News Writer

homeHomeamp_storiesWeb Storieslocal_fire_departmentTrendingplay_circleVideosmark_email_unreadNewsletter