KP Group’s Remarkable Achievement, Seven Windmills Simultaneously Installed in South Gujarat

KP Group Sets Record with Simultaneous Installation of Seven Windmills in South Gujarat Surat (Gujarat) [India], May 13: KPI Green Energy Limited (NSE – BSE listed), the flagship company of the KP Group, a pioneering force in India’s renewable sector, has made history with the installation and commissioning of wind turbines under the Hybrid Policy […]

PNN
PNN Verified Media or Organization • 25 Apr, 2026Agency
May 13, 2023 • 1:13 PM  0
P
Press Release
NEWS CARD
Logo
KP Group’s Remarkable Achievement, Seven Windmills Simultaneously Installed in South Gujarat
“KP Group’s Remarkable Achievement, Seven Windmills Simultaneously Installed in South Gujarat”
Favicon
Read more onthebizzstories.com
13 May 2023
https://www.thebizzstories.com/kp-groups-remarkable-achievement-seven-windmills-simultaneously-installed-in-south-gujarat
Copied
KP Group’s Remarkable Achievement, Seven Windmills Simultaneously Installed in South Gujarat

KP Group Sets Record with Simultaneous Installation of Seven Windmills in South Gujarat

Surat (Gujarat) [India], May 13: KPI Green Energy Limited (NSE – BSE listed), the flagship company of the KP Group, a pioneering force in India’s renewable sector, has made history with the installation and commissioning of wind turbines under the Hybrid Policy in South Gujarat.

This accomplishment is backed by the scientific approach of visionary Mr Faruk G. Patel, Chairman and Managing Director of the company. The group successfully installed seven wind turbines and their solar portion at various villages in Kora village, Bharuch district.

historyThis is an archived post. The information provided may be outdated.
PNN

PNN Verified Media or Organization • 25 Apr, 2026Agency

(This is an unedited and auto-generated story from Syndicated News feed, TBS Staff may not have modified or edited the content body)

homeHomeamp_storiesWeb Storieslocal_fire_departmentTrendingplay_circleVideosmark_email_unreadNewsletter